i know what they’re saying, but they’re objectively wrong. Sure it’s hard, it’s not the most trivial thing to do. Harder than engineering, designing, and building a CCG turbine plant from the ground up? Highly doubt it, probably more expensive though.
Nuclear base load is an incredibly good strategy though, although nuclear isn’t fossil fuels, so.
i know what they’re saying, but they’re objectively wrong. Sure it’s hard, it’s not the most trivial thing to do. Harder than engineering, designing, and building a CCG turbine plant from the ground up? Highly doubt it, probably more expensive though.
Nuclear base load is an incredibly good strategy though, although nuclear isn’t fossil fuels, so.