• CanIFishHere@lemmy.ca
    link
    fedilink
    arrow-up
    3
    arrow-down
    1
    ·
    3 days ago

    From the story:

    The property must connect to the City of Regina’s water main for “essential” potable water to meet fire safety regulations. The cooling system for the centre’s databanks will otherwise be a closed-loop system, filled separately, according to the report.

    • WoodScientist@lemmy.world
      link
      fedilink
      arrow-up
      5
      ·
      3 days ago

      What a bunch of horseshit.

      Sure, sprinklers are required, but no reason that has to be connected to city water. And if the cooling system is that efficient and closed-loop, they could fill it by trucking in water instead. If they only have to fill it up once with the occasional top-off, filling the system up by tanker truck is a perfectly viable option.