• gedhrel@lemmy.world
    link
    fedilink
    arrow-up
    5
    ·
    4 months ago

    Possibly the thing that was intended to be deployed was. What got pushed out was 40kB of all zeroes. Could’ve been corrupted some way down the CI chain.

        • Miaou
          link
          fedilink
          arrow-up
          1
          ·
          4 months ago

          Not the most at fault, but if you sign off on a shitty process, you are still partially responsible

          • gedhrel@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            4 months ago

            That depends entirely on the ability to execute change. CTO is the role that should be driving this.