• streetfestival@lemmy.ca
      link
      fedilink
      English
      arrow-up
      5
      ·
      3 days ago

      The bike lanes are pretty long and extensive because they wouldn’t be an attractive traveling option otherwise. The job will require planning of how to ‘renovate’ in addition to the actual roadwork. $48 million doesn’t really surprise me. Ford’s idea isn’t about fiscal prudence or easing traffic, it’s about appealing to suburban and rural voters and Ford trying to build a highway and circumvent opposition to do so: https://thenarwhal.ca/ontario-highway-413-bill-explainer/

      • Cows Look Like Maps@sh.itjust.worksOPM
        link
        fedilink
        English
        arrow-up
        2
        ·
        edit-2
        2 days ago

        They also need to change all sorts of traffic lights and repave large sections road. There are cement barriers implanted into the road and the large removable ones have been there for so long they’d leave imprints in the asphalt. Not to mention maneurvering through the city with construction equipment while attempting to keep one way traffic in a single lane open.