A new Innofact poll shows 55% of Germans support returning to nuclear power, a divisive issue influencing coalition talks between the CDU/CSU and SPD.

While 36% oppose the shift, support is strongest among men and in southern and eastern Germany.

About 22% favor restarting recently closed reactors; 32% support building new ones.

Despite nuclear support, 57% still back investment in renewables. The CDU/CSU is exploring feasibility, but the SPD and Greens remain firmly against reversing the nuclear phase-out, citing stability and past policy shifts.

  • BestBouclettes
    link
    fedilink
    English
    arrow-up
    4
    ·
    16 hours ago

    Our largest power plant, with 6 reactors, was built in 6 years. To this day it provides us with around 6% of our global power requirements. It’s been running for 45 years, producing 32TWh per year with 0 carbon emissions.

    It’s like we could build them faster if we wanted to ? We’ve done it already, we can do it again.

    • wewbull@feddit.uk
      link
      fedilink
      English
      arrow-up
      1
      arrow-down
      4
      ·
      13 hours ago

      45 years would be 1980. That sounds like you’re refering to Zaporizhzhia Nuclear Power Plant, but construction started in 1980, and although the first five reactors went live 5 years later the 6th reactor didn’t go live until 1996. 16 years later.

      Even so, you’re only counting construction. That plant would have been being designed for at least 5 years previous.

      And safety standards have gone up since then, in part because of it’s slightly older cousin at Chernobyl (different design, but also built in 5 years).

      • BestBouclettes
        link
        fedilink
        English
        arrow-up
        3
        ·
        edit-2
        13 hours ago

        I’m talking about Gravelines in France. The first reactor was plugged into the national grid 6 years after construction began. The 6th reactor in 1985.

        The EPR2 is already designed, and in service in Flamanville. Flamanville 3 took a long time because we had to rebuild our whole nuclear industry, by lack of political vision back in the 90’s-00’s.

        We’re building it again, two by two this time, and hopefully in less than half the time and budget.